Project Status: Completed Client: Gulf Warehousing Company (GWC) Consultant: Gulf Engineering Industrial Consultants (GEIC) Main Contractor: Al Bader Contracting & Steel Works Total Build up Area: 10,000m2 Floor Type & Category: Defined Movement DM2 as per TR 34 4th Edition Execution Period: November 2013 - December 2013.
The Project consists of 1 Warehouse with clear height 12 meters. The use of the warehouse is VNA with racking at 1,80m.
The floor Type and category was chosen as per TR 34 4th Edition (height or last pallet deposit 8-13m)